Standards · Guides · Glossary

Knowledge Gateway.

Every UK drainage standard Quinnsite is built against, step-by-step guides for each design stage, and a searchable glossary of the terms engineers, planners and contractors have to speak fluently.

Step-by-step guides

Read these in order the first time you build a full scheme in Quinnsite; each tutorial builds on the last and opens the calculators in sequence. Already experienced? Jump straight to the step you need.

UK standards & codes of practice

The regulatory and technical framework Quinnsite is built against. Each card is a quick-reference summary; use the in-suite pages for deeper walk-throughs, or the publisher's link to access the original document.

National frameworks
British & European design standards
In-suite reference pages

Drainage glossary

Core vocabulary for UK SuDS design: regulatory acronyms, hydrology terms, and the components that make up a management train. Use the search or jump by letter.

A

Attenuation storage
Temporary volume that holds rainfall runoff to reduce peak discharge rates so flow leaving a site doesn't exceed the agreed greenfield rate.
Adoption
The transfer of a completed drainage asset to a statutory undertaker (water company or local authority) for long-term maintenance, typically under a S104 or SSG agreement.

B

Bioretention
A shallow vegetated basin with an engineered filter media that treats and, where conditions allow, infiltrates surface water. Also known as a rain garden.
BRE 365 Digest
BRE Digest 365: the UK's standard procedure for field-testing soil infiltration rates and sizing soakaways.
BNG Biodiversity Net Gain
The statutory 10% uplift in biodiversity units required of most new development in England since February 2024.

C

Catchment
The area of land that drains to a single point. In urban drainage, subdivided into impermeable, permeable and receiving-water sub-catchments.
CC uplift Climate Change
Percentage increase applied to design rainfall to account for climate change, published by the Environment Agency by management catchment and time horizon.
CIRIA C753
The SuDS Manual: the industry design reference covering site assessment through to operation and maintenance, published by CIRIA.
Conveyance
The pipes, swales and channels that move surface water from catchment to storage or discharge point.
Cover level
Finished ground level at a manhole cover, used alongside invert level to size shaft depth and check against hydraulic grade line.

D

Detention basin
A normally dry vegetated depression that stores runoff during events and releases it at a controlled rate.
Discharge rate
The rate (typically l/s or l/s/ha) at which runoff leaves a site, regulated against greenfield rates under NSTS S2.

E

Exceedance
The overland flow path used when rainfall exceeds the design event. NSTS S6 requires an exceedance route for the 1-in-100-year + CC storm.
Embodied carbon
The carbon emitted in producing and installing drainage materials (concrete, HDPE, aggregate, geotextile), increasingly included in scheme appraisals.

F

FEH Flood Estimation Handbook
UK rainfall and flood frequency method. Produces design rainfall depths for storm durations and return periods.
Filter strip
A gently-sloped vegetated area that treats runoff from a contributing area by filtration, sedimentation and infiltration.
Forebay
A small settlement pool upstream of a pond or wetland that intercepts coarse sediment and extends the O&M interval of the main feature.
FRA Flood Risk Assessment
A report demonstrating that a development is safe from flooding and does not increase flood risk elsewhere, required for most planning submissions.

G

Greenfield runoff
The estimated pre-development surface water runoff for a site, calculated using IH124 or FEH methods. Sets the cap on post-development discharge.
Green roof
A vegetated roof system (extensive or intensive) that attenuates rainfall, reduces runoff volume and provides amenity and biodiversity benefits.

H

HGL Hydraulic Grade Line
The water surface in a pressurised drainage system, checked against cover/finished levels to confirm the network doesn't surcharge.

I

IH124 Institute of Hydrology 124
Classic UK method for estimating greenfield runoff rates (QBAR), still widely accepted by statutory consultees.
Impermeable area
The portion of a catchment from which runoff is effectively 100%: roofs, paving, tarmac.
Infiltration rate
The rate at which water soaks into the ground, typically measured by a BRE 365 soakaway test and expressed in m/s or mm/hr.
Interception
Capture and attenuation of the first 5 mm of rainfall, required by NSTS S1 for every development.
Invert level
The lowest internal level of a pipe or manhole, used to calculate gradients and cover depth.

M

Management train
The chain of source, site and regional controls that together deliver interception, treatment and attenuation, the central design concept in CIRIA C753.
Manning's n
A roughness coefficient used in open-channel flow equations: swales typically 0.05–0.15, smooth pipe 0.010–0.013.

N

NSTS Non-Statutory Technical Standards
Defra's S1–S7 technical standards for SuDS in England. Refreshed June 2025.

O

Orifice
A flow control opening, usually a plate or vortex device sized to limit discharge from storage to the allowable rate.
Outfall
The point where a drainage system discharges to a watercourse, soakaway or public sewer.

P

Permeable paving
A paved surface that allows rainfall to infiltrate between or through the blocks into a sub-base storage layer.
Pollution hazard
Indices (very low, low, medium, high) used in CIRIA C753 to match land-use pollutant loads to mitigation indices of SuDS components.

Q

QBAR
Mean annual maximum flood flow, the reference greenfield discharge rate from the IH124 method.

R

Rainwater harvesting
Collection and reuse of rainfall for non-potable demand. Sized to BS EN 16941-1:2024 (formerly BS 8515). Attenuation benefit depends on yield and occupancy profile.
Retention pond
A permanent wet pond that stores runoff and provides water-quality treatment by settlement and biological processes.

S

S1–S7
The seven Defra Non-Statutory Technical Standards: runoff destination, peak rate, volume, water quality, amenity, exceedance, and construction/operation.
SAB SuDS Approving Body
The statutory approver of SuDS schemes under Schedule 3 of the Flood & Water Management Act. Operational in Wales; England awaits full commencement.
Source control
Any SuDS component that manages runoff close to where it falls: green roofs, permeable paving, soakaways, rainwater harvesting.
Surcharge
When a pipe runs full under pressure, the hydraulic grade line rises above the pipe soffit. Beyond design capacity this triggers exceedance.
Swale
A broad, shallow vegetated channel that conveys, treats and, where ground conditions allow, infiltrates surface water.

T

Treatment train
A sequence of SuDS components arranged to progressively improve runoff quality: pre-treatment, treatment, polishing.
Tree pit
An engineered planting pit for urban trees, often with structural soil and a drainage connection that doubles as bioretention.

W

WFD Water Framework Directive
EU-derived regime (retained in UK law) that requires no deterioration of waterbody status, screened for any scheme discharging to a watercourse.
Wetland
A SuDS component with permanent shallow water and emergent planting, providing high treatment and ecological value.
No terms match that search. Try a broader keyword.

Got the reference, ready to build? The Design Journey walks the same standards through five lifecycle stages: site appraisal, source control, storage, conveyance, sign-off.

Walk the Design Journey