Design Workflow Tutorial
Step-by-step guide from site assessment to planning submission, with direct links to every calculator you need
Establish Baseline
Calculate the greenfield runoff rate for your site, the peak discharge rate as if the site were entirely undeveloped. This is the anchor point for all downstream calculations and the compliance benchmark for S3.
Define Discharge Strategy
Determine your preferred runoff destination following the S1 hierarchy: harvesting for reuse, infiltration to ground, surface water discharge, or sewer discharge. Assess site constraints (soil infiltration capacity, groundwater proximity, receiving watercourse availability) to establish which destinations are feasible.
Consult with statutory bodies (Environment Agency, LLFA, sewerage undertaker) and review site investigation data to guide your S1 hierarchy decision.
Manage Everyday Rainfall
Design features to achieve S2 compliance: at least 5 mm of rainfall from the site must be captured, infiltrated, or evaporated without resulting in runoff. Calculate interception storage requirements for green roofs, rainwater harvesting tanks, permeable pavements, swales, or bioretention.
Size Attenuation Storage
Calculate storage volume and orifice (outlet) sizing for detention basins, retention ponds, and other attenuation features to meet S3 discharge limits: 50% AEP and 1% AEP events, including climate change uplifts and urban creep adjustments.
Assess Water Quality
Design a treatment train using the Simple Index Approach to achieve S4 compliance. Identify the site's pollution hazard, select SuDS features with appropriate treatment efficiency, and demonstrate that the combined train achieves adequate removal of sediments, metals, and hydrocarbons.
Design Individual Components
Now that the overall strategy is set (S1–S5), design each individual SuDS component to detailed engineering standard. Sizing, materials, construction details, and maintenance access requirements must be specified.
Size Building Drainage
Design the guttering and downpipe system for the building itself, sized to convey the design rainfall to collection points or downpipe outlets. Building drainage is distinct from site SuDS but must interface correctly.
Full Compliance Audit
Once all components are sized and integrated, conduct a master compliance check against all seven National Standards (S1–S7). Confirm that the overall design strategy meets S1 (hierarchy), S2 (interception), S3 (peak discharge), S4 (water quality), S5 (amenity), S6 (biodiversity), and S7 (constructability and maintenance). Generate a planning submission PDF documenting compliance with evidence and calculations.
Before You Submit
Make sure you have completed and documented each of these items:
- Greenfield runoff rate calculated (S3 benchmark established)
- Discharge destination confirmed (S1 hierarchy assessed)
- Interception storage designed (S2 compliance demonstrated)
- Attenuation storage sized (S3 discharge limits met for 50% and 1% AEP)
- Treatment train designed (S4 water quality compliance verified)
- All SuDS components detailed to engineering standard
- Building drainage integrated with site SuDS
- S5 amenity and S6 biodiversity features identified
- S7 maintenance plan and access documented
- Full S1–S7 compliance audit completed
- Design report generated for planning submission
- Consultation records with LLFA and statutory bodies archived
Last reviewed: 2026-05-10 · Sources cross-checked against the canonical registry at the time of publication. Standards may be updated; verify currency against the publisher before relying on any citation.