IH 124 / FEH greenfield runoff rates for QBAR, Q1, Q30, Q100: the basis for greenfield runoff targets under Defra NSTS S2.
1
Site Info
2
Calculate
3
Compliance
4
Export PDF
Project & Site Details
Fields marked * are required
Range: 0.01 to 200 ha
IH124 is calibrated for catchments ≥ 0.5 km² (50 ha); below 50 ha the rate is linearly scaled from the 50 ha reference and should be treated as indicative
From FEH Web Service or Met Office. UK range: 500-3000 mm
SAAR typically ranges 500–3000 mm for UK sites (FEH)
Hydrological Parameters
FSR/WRAP SOIL index (used in the IH124 QBAR regression) — not SPR(HOST). Select from catchment-wide soil data.
From FEH dataset. UK average = 125
For greenfield: 0.00. Urban adjustment only for comparison purposes.
Indicative regional growth factors — confirm with FEH / ReFH for design
If known from previous calculation or specialist study
Soil classification based on FSR/WRAP SOIL index values
Regional growth factors are indicative — confirm with FEH / ReFH statistical analysis for design
IH124 is calibrated for catchments ≥ 0.5 km² (50 ha); smaller areas are linearly scaled from the 50 ha reference rate
Climate-change uplift is not added to greenfield rates (they are the natural limit)
Urban fraction = 0 for true greenfield areas
Important:
This calculator provides QBAR (mean annual flood) and design return periods for greenfield sites. Results must be verified by a qualified drainage engineer and validated against site-specific hydrological assessments.
For greenfield sites, peak discharge for the 1-in-1-year and 1-in-100-year events must not exceed the greenfield rate for the same event. There is no "1 l/s/ha" or "3 l/s/ha" minimum in the national standards; a practical minimum outflow of ~5 l/s is often adopted to avoid blockage-prone controls (engineering judgement).
Export PDF Report
Generate a professional PDF report containing all calculations, results, and compliance assessment. The report will include:
Project and site information
Input parameters and hydrological data
Detailed calculation methodology with equations
Design discharge rates for all return periods
Defra NSTS S2 greenfield compliance assessment
Assumptions and limitations
Professional footer and branding
Report Information
PDF Contents:
The generated report is suitable for submission to local planning authorities as part of FRA (Flood Risk Assessment) and SuDS design documentation. All calculations follow IH Report 124 (Marshall & Bayliss, 1994) and the Defra Non-Statutory Technical Standards for SuDS (2015).