Standard 2: first 5 mm interception storage compliance for the design rainfall depth.
Fields marked * are required
Add all drainage areas and their associated SuDS components. Each row represents a sub-catchment contributing to interception storage.
| Name/Ref | Total Area (m²) | Impermeable Area (m²) | SuDS Type | SuDS Area (m²) | Infiltration Rate (m/s) | Gradient | Action |
|---|
All impermeable surfaces must manage the first 5mm of rainfall through SuDS interception features. The required interception volume for each sub-catchment is calculated as: Impermeable Area × 0.005m
| Sub-Catchment | Required Vol. (m³) | Component Type | Compliance Mechanism | Ratio | Status |
|---|
2025 National Standard S2 requires different interception thresholds for seasonal conditions:
of rainfall events intercepted
of rainfall events intercepted
Design Note: Deemed compliant components automatically satisfy these seasonal thresholds. Non-deemed components require detailed design verification to demonstrate compliance with seasonal percentages.
Components marked as "DEEMED COMPLIANT" automatically satisfy 2025 National Standard S2 Requirements 2.6-2.7. Others require detailed demonstration.
| Component Type | Deemed Compliant Criteria |
|---|---|
| Green Roof (unlined) | Impermeable area ≤ green roof area (drains own roof) |
| Permeable Paving (unlined) | Contributing impermeable area ≤ paving area |
| Bioretention | Impermeable area ≤ 5× vegetated area; OR ≤ 25× if infiltration rate > 1×10⁻⁶ m/s |
| Swale (unlined) | Gradient <1:100 AND impermeable area ≤ 5× swale area |
| Detention Basin (unlined) | Impermeable area ≤ 5× basin base area |
| Infiltration Trench | Deemed compliant for roads; size per BRE DG365 |
| Rainwater Harvesting | Designed per BS EN 16941-1:2024 |
| Soakaway | Sized per BRE DG365 |
| Permeable Paving (lined) | NOT deemed compliant: requires calculation |
| Attenuation Pond | NOT deemed to deliver interception |
Add drainage areas to assess compliance
| Component Type | Count | Total Area (m²) | Deemed Compliant | Requires Design Verification |
|---|
Generate a professional PDF report of your S2 interception compliance assessment, including all calculations, deemed compliance analysis, and recommendations.
Choose how to export your assessment results.
Your assessment is automatically saved. Use these options to manage your data.