Stage 2 · Tool category

SuDS Component Design.

Choose and size the SuDS components that make up the management train: permeable paving, green roofs, bioretention, swales, tree pits, filter drains, filter strips, channel drainage and rainwater harvesting.

9 TOOLS Aligned with CIRIA C753 · Defra NSTS · BS EN 16941-1

No tools match that filter. Try “paving”, “swale” or “green roof”.

Next in the design journey
Stage 3: Storage & Treatment
Continue → Storage & Treatment