Early-stage SuDS feasibility: site constraints, infiltration potential and component shortlist.
1
Site Parameters
2
Component Comparison
3
Treatment Train
Site Parameters
Define the characteristics of your site. These parameters will be used to assess feasibility for all SuDS component types.
Project Information
Area & Land Use
Soil & Groundwater
Rainfall & Climate
Space Constraints
Note: If any parameters are unknown, select "Unknown" and the tool will flag components requiring site investigation.
Component Feasibility Matrix
Automatic feasibility assessment based on your site parameters. Storage volumes and costs are estimated.
Component
Feasible?
Storage (m³)
Footprint (m²)
Est. Cost
Treatment Level
Notes
Feasibility Legend
✓ Feasible Component is suitable for this site with standard design.
✗ Not Feasible Constraints prevent use without significant mitigation.
⚠ Requires Investigation Further site investigation or specialist design needed.
Recommended Treatment Trains
Based on site feasibility, three optimal treatment train combinations are shown below. Each offers different trade-offs between treatment performance, cost, and footprint.
Compliance Assessment
Run feasibility screen to predict S2 compliance.
Export Report
Generate a PDF summary of this feasibility assessment to share with your team or regulatory body.