Generate a CIRIA C753 compliant maintenance schedule with frequency, tasks and responsibilities.
Enter development details and list all SuDS components on site
| Component Type | Quantity / Area | Location | Design Life (yrs) | Adoptable? | Action |
|---|
Review and customise maintenance tasks for each component
Maintenance schedules have been generated based on industry best practice (CIRIA C753). Review tasks below and adjust as needed for your specific site conditions.
Tasks are colour-coded by frequency. Review responsible parties and ensure maintenance access routes are defined.
Annual and lifecycle maintenance costs at 3.5% discount rate
Annual cost multiplied by NPV factor (3.5% discount rate, HM Treasury Green Book methodology).
25-year factor: 16.48 | 60-year factor: 25.38
Commuted sum represents full lifecycle cost for water company adoption.
Track Defra S7 requirements and management responsibilities
Annual Maintenance Cost
£0
25-Year Capitalised Cost (for LA adoption)
£0
Select adoption pathway and confirm legal requirements
• As-built drawings and specifications
• Operation & Maintenance Manual
• Health & Safety File (CDM compliance)
• Warranty & defects documentation
• CCTV inspection records (if applicable)
• Inspection schedule templates
Create your comprehensive Maintenance Management Plan PDF
Your PDF will include:
• Cover page with development details
• Complete SuDS inventory table
• Full maintenance schedule (all tasks, all frequencies)
• Annual cost summary and 25-year lifecycle projection
• Adoption pathway and legal requirements
• Handover checklist
• Blank inspection record template (Appendix A)
Generating PDF document...