Standard 4 compliance: exceedance event routing and safe overland flow design.
Define the site characteristics and design storm conditions for SuDS and exceedance analysis.
Define the SuDS storage and discharge characteristics, and identify overflow points.
Design emergency spillways for each overflow point using weir equations.
Define how exceedance flows are routed and assess flood hazard.
Select all applicable overflow routes for your design:
Review design storm capacity, exceedance provisions, and regulatory compliance.