CIRIA C753 §23: sizing for treatment, attenuation and biodiversity in constructed wetlands.
1
Site & Catchment
2
Wetland Type
3
Sizing & Hydraulics
4
Vegetation
5
Safety & Access
6
Results
Site & Catchment Parameters
Enter site-specific and rainfall data to define your drainage catchment
Project Information
ha
m²
l/s
Wetland Type & Configuration
Select wetland design approach and configuration parameters
Wetland Type Selection
Surface Flow Configuration
Sub-surface Flow Configuration
Sizing & Hydraulics
Calculate treatment volume and hydraulic residence time
Note: The calculator will compute the required wetland area and volume based on your design parameters. Hydraulic residence time (HRT) is critical for treatment effectiveness.
mm
Sizing Calculations
Treatment Volume Required
-
m³
Wetland Surface Area
-
m²
Actual Hydraulic Residence Time
-
hours
Design Compliance
PASS
Pollutant Removal Estimates
First-order kinetics: Ce/Ci = exp(-k × HRT)
Pollutant
k value (/day)
Inlet Conc. (mg/l)
Outlet Conc. (mg/l)
Removal %
TSS (Suspended Solids)
-
100
-
-
Total Phosphorus (P)
-
1.5
-
-
Total Nitrogen (N)
-
30
-
-
BOD₅
-
80
-
-
Metals (Cu, Zn)
-
0.5
-
-
Vegetation & Biodiversity
Plan planting zones and assess biodiversity compliance (Defra S6)
Defra S6 Guidance: Require minimum 3 vegetation zones, native species, open water habitat, and habitat feature provision for wildlife.