Home / Storage & Treatment / Constructed Wetlands
Storage & Treatment CIRIA C753 §23

Constructed Wetlands Calculator

CIRIA C753 §23: sizing for treatment, attenuation and biodiversity in constructed wetlands.

1
Site & Catchment
2
Wetland Type
3
Sizing & Hydraulics
4
Vegetation
5
Safety & Access
6
Results

Site & Catchment Parameters

Enter site-specific and rainfall data to define your drainage catchment

Project Information

ha
l/s

Wetland Type & Configuration

Select wetland design approach and configuration parameters

Wetland Type Selection

Surface Flow Configuration

Sub-surface Flow Configuration

Sizing & Hydraulics

Calculate treatment volume and hydraulic residence time

Note: The calculator will compute the required wetland area and volume based on your design parameters. Hydraulic residence time (HRT) is critical for treatment effectiveness.
mm

Sizing Calculations

Treatment Volume Required
-
Wetland Surface Area
-
Actual Hydraulic Residence Time
-
hours
Design Compliance
PASS

Pollutant Removal Estimates

First-order kinetics: Ce/Ci = exp(-k × HRT)

Pollutant k value (/day) Inlet Conc. (mg/l) Outlet Conc. (mg/l) Removal %
TSS (Suspended Solids) - 100 - -
Total Phosphorus (P) - 1.5 - -
Total Nitrogen (N) - 30 - -
BOD₅ - 80 - -
Metals (Cu, Zn) - 0.5 - -

Vegetation & Biodiversity

Plan planting zones and assess biodiversity compliance (Defra S6)

Defra S6 Guidance: Require minimum 3 vegetation zones, native species, open water habitat, and habitat feature provision for wildlife.

Planting Density & Species

Biodiversity S6 Compliance Checklist

Recommended Planting Schedule

Zone Water Depth Example Species Function
Zone 1: Deep >0.6m Potamogeton, Ceratophyllum, Ranunculus Oxygen production, sediment stabilization
Zone 2: Emergent 0.3–0.6m Phragmites australis, Typha latifolia, Iris pseudacorus Primary treatment, nutrient uptake, bird habitat
Zone 3: Shallow <0.3m Juncus effusus, Carex nigra, Lythrum salicaria Invertebrate habitat, secondary treatment
Zone 4: Banks Above water Alder, Willow, native wildflower mix Riparian buffer, shelter, erosion control

Safety & Access

Define safety parameters and maintenance access requirements

Duty of Care: Assess water depth hazards in publicly accessible areas and implement appropriate control measures.

Depth & Slope Safety

mm

Maintenance Access

Results & Compliance Summary

Review final design and export documentation

Wetland Dimensions

Surface Area
-
Length
-
m
Width
-
m
Volume
-

Compliance Assessment

Defra S4 Water Quality Compliance

Design criteria for this standard — the assessed result is shown below.

  • Water-quality treatment volume sized on impermeable area × design rainfall depth
  • TSS removal ≥80% (basic-treatment target)
  • HRT ≥24 hours for basic treatment
  • Inlet sediment forebay recommended
  • Design for NORMAL water sensitivity

Defra S4 Status: COMPLIANT

Defra S5 Safety Compliance

Design criteria for this standard — the assessed result is shown below.

  • Max public area depth ≤600mm or fenced
  • Above-water slope ≤1:3
  • Below-water slope ≤1:4
  • Freeboard ≥0.3m above design level
  • Safety signage (deep water / no swimming)
  • Maintenance access ≥3m wide

Defra S5 Status: COMPLIANT

Defra S6 Biodiversity Compliance

Biodiversity criteria — the assessed result (from the Step 4 checkboxes) is shown below.

  • Native species only
  • Minimum 3 vegetation zones
  • Open water habitat (≥20%)
  • Shallow margins <0.3m for invertebrates
  • Habitat features (logs, stones)
  • Habitat corridor connectivity

Defra S6 Status: COMPLIANT (6/6 criteria)

CIRIA C753 §23 Compliance

CIRIA recommends HRT-based design with first-order kinetics modelling for pollutant removal.

Design criteria for this standard — the assessed result is shown below.

  • HRT ≥24 hours (minimum for 80% TSS)
  • Length:width ratio ≥3:1 for surface flow
  • Inlet sediment settling zone
  • Outlet structure controls water level
  • Vegetation zones
  • SIA mitigation index considered

CIRIA C753 Status: COMPLIANT

Pollutant Removal Summary

Pollutant Inlet (mg/l) Outlet (mg/l) Removal % CIRIA Target

Maintenance Requirements Summary

  • Establishment Phase (Year 1): Fortnightly inspection, weed control, plug survival monitoring, hydraulic testing
  • Operational Phase (Years 2-5): Quarterly inspection, vegetation management, sediment monitoring, invert/outlet clearance
  • Long-term (5+ years): Annual inspection, silt removal (if depth <50% design), vegetation thinning, habitat enhancement
  • Emergency Response: Inlet blockage clearance, outlet failure response, algal bloom management
Saved ✓